300.58. Measure of Damages to Prop Outside Easement-Overhead Elec. Transmission Line-Damage Admitted-Amt Contested | Pdf Doc Docx | Illinois_JI

 Illinois Jury Instructions   Civil   300 Eminent Domain 
300.58. Measure of Damages to Prop Outside Easement-Overhead Elec. Transmission Line-Damage Admitted-Amt Contested | Pdf Doc Docx | Illinois_JI

Last updated: 6/3/2014

300.58. Measure of Damages to Prop Outside Easement-Overhead Elec. Transmission Line-Damage Admitted-Amt Contested

Start Your Free Trial $ 5.99
200 Ratings
What you get:
  • Instant access to fillable Microsoft Word or PDF forms.
  • Minimize the risk of using outdated forms and eliminate rejected fillings.
  • Largest forms database in the USA with more than 80,000 federal, state and agency forms.
  • Download, edit, auto-fill multiple forms at once in MS Word using our Forms Workflow Ribbon
  • Trusted by 1,000s of Attorneys and Legal Professionals

Description

300.58 Measure of Damages to Property Outside Easement Strip--Overhead Electric Transmission Line--Fact of Damage Admitted--Amount Contested The measure of damages to the property of the defendant outside the easement strip is the difference between the fair cash market value of the property immediately before the structures are in place and its fair cash market value immediately after the structures are in place.

Related forms

Our Products