Notification Of Demolition And Renovation Operations {44593} | | Indiana

 Indiana   Statewide   Department Of Enviromental Management   Air 
Notification Of Demolition And Renovation Operations {44593} |  | Indiana

Last updated: 4/13/2015

Notification Of Demolition And Renovation Operations {44593}

Start Your Free Trial $ 21.99
200 Ratings
What you get:
  • Instant access to fillable Microsoft Word or PDF forms.
  • Minimize the risk of using outdated forms and eliminate rejected fillings.
  • Largest forms database in the USA with more than 80,000 federal, state and agency forms.
  • Download, edit, auto-fill multiple forms at once in MS Word using our Forms Workflow Ribbon
  • Trusted by 1,000s of Attorneys and Legal Professionals

Description

Indiana Department of Environmental Management GUIDANCE FOR PREPARING ASBESTOS DEMOLITION/RENOVATION NOTIFICATIONS **Per Indiana Rule 326 IAC 14-10-3(1), all notifications to the IDEM must be submitted on State Form Number 44593. Per 326 IAC 14-10-5, demolition/renovation fees will be assessed quarterly to owners/ Operators submitting notifications during the previous quarter. I. Type of Notification -326 IAC 14-10-3(4). A. If this is the original notice, please check the appropriate space on the notification form. B. If this is a revised notice, please check the appropriate space on the notification form. The revised notice must be postmarked and sent by certified mail, return receipt requested, at least 5 working days or delivered at least 2 working days before the start date of asbestos stripping or removal specified in: (1) the notice being revised and (2) the new revised notice. Facsimiles will be accepted by the IDEM. C. All revisions must include a copy of the notice being revised. D. If this is a canceled notice, please check the appropriate space on the notification form. E. Courtesy Notification II. Facility Information - 326 IAC 14-10-3(3)(B) and (R) A. B. C. D. Either the owner or operator must submit the notice. The owner means the individual(s) who own the property or lease the property. The operator means the asbestos removal contractor or demolition contractor. Specify the name, address, telephone number, Indiana license number and license expiration date, of the: 1. asbestos removal contractor, 2. inspector who conducted the assessment prior to demolition or renovation and 3. project designer required or asbestos projects at schools K-12, or if project designer is used for non-school projects must be licensed. III. Type of Operation - 326-IAC 14-10-3(3)(C), (O) and (S) A. Refer to the definitions of demolition, renovation, and emergency renovation Operation in 326-IAC 14-10-2. B. Ordered demolitions and emergency renovation operations have additional American LegalNet, Inc. www.FormsWorkFlow.com Notification requirements. Owner/operator must also complete Section XV or XVI of notification form. C. Demolition by intentional burning must comply with an approved Variance from Opening Burning Regulation 326IAC 4-1. IV. Is Asbestos Present? - Required by Federal 40 CFR Part 61, Subpart M A. If asbestos is present, indicate "yes" in the space provided. B. If asbestos is not present, indicate "no". V. Procedures, Including Analytical Methods, if appropriate, Used to Detect the Presence and Amount of Asbestos Material - 326 IAC 14-10-3(3)(E). Describe how the asbestos was detected and, if samples were analyzed, specify the amount of friable asbestos visually during a walk-through inspections using a tape measure, blueprints, or pacing. Analytical methods could include the collection of samples and sample analyses by a polarized light microscope with dispersion staining. For samples that test under 10% asbestos content: An owner or operator may (1) elect to assume material to be greater than 1% asbestos, or, (2) require verification by point counting in which the point counting result will supercede the visual estimation. Either choice and result should be stated on the notice when a sample is under 10% asbestos. VI. Approximate Amount of Asbestos to be Removed - 326 IAC 14-10-3(3)(F) A. Specify the amount of regulated (friable) asbestos-containing material to be removed as follows: 1. linear feet on pipes, 2. square feet (surface area) on the facility components, and 3. total cubic feet (volume) on or off all facility components. (All reported regulated amounts must be converted to cubic feet). B. Estimate the approximate amount of Category I and Category II non-friable asbestos-containing material in the affected part of the facility that will be removed before demolition. C. Estimate the approximate amount of Category I and Category II non-friable asbestos-containing material in the affected part of the facility that will not be removed before demolition. VII. Scheduled Dates of Asbestos Stripping/Removal - 326 IAC 14-10-3(3)(H) This means the actual start and end dates of the asbestos stripping or removal. VIII. Scheduled Dates of Asbestos Stripping/Removal - 326 IAC 14-10-3(3)(H) American LegalNet, Inc. www.FormsWorkFlow.com This means the starting and ending dates of the total demolition or renovation operation. For example: A renovation project may be scheduled from February 1 through March 15, 1995, however, the actual asbestos removal will occur from February 15, through 20, 1995. Demolition must start on date given in most recent notification. . IX Facility Description - 326 IAC 14-10-3(3)(D) and (G) Include the building name, floor and number of the room(s) where the asbestos stripping or removal will take place. Provide enough detail that an unfamiliar inspector can find the asbestos project without asking anyone. X. Description of planned Demolition or Renovation Work, Methods/Techniques to be Used, and Affected Facility Components - 326 IAC 14-10-3(3)(K) Briefly describe the methods to be used to conduct the demolition or renovation. For renovations, these methods may include gross removal, glove bag removal, hand stripping or scraping. For demolitions, methods may include a wrecking Ball, bulldozer, dynamite, or unbolting panels or sections and carefully lowering to the ground. Affected facility components may include pipe wrap, floor tile, sprayed-on insulation, transite, etc. XI. Description of Work Practices and Engineering Controls To Be Used To Prevent Emissions of Asbestos At the Site, Including Asbestos Stripping, Removal, and Waste Handling Procedures and the Procedures to Prevent Non-Friable Asbestos Material from Becoming Friable in the Course of the Project 326 IAC 14-10-3(3)(L) A. Examples of work practices and engineering controls to prevent asbestos emissions at the site would include: the use of water or wetting agents, containments, and negative air units during removal; placing into leak-tight containers or wrapping with six (6) mil thick polyethylene plastic sheeting which is properly labeled prior to disposal, etc. B. Examples of removal and waste handling procedures to prevent non-friable material from becoming friable would include: removing by sections or units taking care not to crumble, pulverize, or reduce to power, using water to prevent any emissions, placing into leak-tight containers or wrapping with six (6) mil thick plasti

Related forms

Our Products